Lake Geneva Without Borders — Energy-positive villa · new build, French side of the Lake Geneva arc, overall view

New build • Premium contemporary villa

Lake Geneva Without Borders

  • 2025 delivery
  • 280 m² area
  • 13 months works
  • 46°15′12″N · 6°14′19″E coordinates

French side of the Lake Geneva arc — near Geneva

Delivered

Key figures

280 m²

Living area

gross floor area

13 months

Delivery

contractual

A+

Energy-positive house

BEPOS

The project

What the brief demanded.

A 280 m² energy-positive villa designed for a Franco-Swiss client with Swiss-standard expectations. The project targets positive energy performance within restrained, technologically advanced contemporary architecture.

The structure rests on a suspended concrete slab with facades in high-performance insulating blocks. The roof integrates a building-integrated photovoltaic system that maximises production while keeping a homogeneous architectural appearance.

The whole energy system combines geothermal heating, 40 kWp of solar panels, an earth-air heat exchanger and high-efficiency balanced ventilation to guarantee a positive annual energy balance.

Proof of mastery

What the site put in our way.

5 major constraints, and how each was resolved on site. This, not the photography, is how a general contractor is judged.

  1. 01

    Overlapping French and Swiss standards — dual validation to RE2020 and SIA 380/1.

  2. 02

    Building-integrated solar roof — waterproofing and electrical work coordinated in a single phase.

  3. 03

    Groundwater geothermal system at 6 m — drilling supervised by the environmental authority (DREAL) with piezometric monitoring.

  4. 04

    Strict contractual deadline — reverse scheduling from the handover date.

  5. 05

    Residential site access — logistics agreed with the local town hall.

Plan · Render

From the line to the material.

The plan of the main level replaces the photographic render wherever your cursor passes. On a touch screen, drag the golden line.

Lake Geneva Without Borders — photographic render of the main level
280 m² · main levelLiving roomdouble heightKitchenPantryMaster suitedressing roomBedroomBedroomSpaindoor poolShower roomTerrasseN
Plan · Render
Schematic plan of the main level — Lake Geneva Without Borders. Move the slider to switch from the photographic render to the architectural drawing.

Handover & result

Delivered four days ahead of the contractual date — positive energy balance after 12 months — class A+.

  • Delivered
  • 13 months on site
  • Owner’s representation

Gallery

08 images.

Click to open the full-screen gallery — keyboard navigation with the arrow keys and Escape.

By invitation

A project of this nature begins with a conversation.

We do not send brochures. Thirty minutes with a founder is enough to scope the plot, the brief and the timetable; the costed feasibility study follows within twenty-one days, under a confidentiality agreement.

Confidential meeting

Your project deserves excellence.

Thirty minutes with a founder. A feasibility study within 21 days. A confidentiality agreement from the very first conversation.