Left Bank, Absolute View — Villa · major renovation, Sévrier (Haute-Savoie), overall view

Major renovation • Lakeside villa

Left Bank, Absolute View

  • 2023 delivery
  • 260 m² area
  • 9 months works
  • 45°51′47″N · 6°08′26″E coordinates

Sévrier (Haute-Savoie), on the shore of Lake Annecy

Delivered

Key figures

260 m²

Renovated area

+ 95 m² of terraces

9 months

Works

excl. utilities

180°

Lake view

Annecy / Talloires

The project

What the brief demanded.

A 1970s villa entirely restructured into a contemporary residence open to Lake Annecy.

Complete interior strip-out, structural strengthening and new openings up to 4.5 m wide to make the most of the view.

External wall insulation, all services renewed and a new interior layout organised around light and views of the lake.

The 52 m² living room now opens onto a 48 m² ipe terrace with glass balustrades, in complete visual continuity with the landscape.

Proof of mastery

What the site put in our way.

5 major constraints, and how each was resolved on site. This, not the photography, is how a general contractor is judged.

  1. 01

    Heritage-architect (ABF) constraints on the lakeshore — every facade change approved.

  2. 02

    Structural strengthening without removing the roof — temporary propping for six weeks.

  3. 03

    Narrow site access (3 m) — sequenced deliveries.

  4. 04

    Occupied site — the house remained lived in throughout the works.

  5. 05

    EPDM terrace waterproofing with laser-controlled falls.

Plan · Render

From the line to the material.

The plan of the main level replaces the photographic render wherever your cursor passes. On a touch screen, drag the golden line.

Left Bank, Absolute View — photographic render of the main level
260 m² · main levelLiving roomload-bearing wall removedKitchenStudyMaster suiteBedroomDressing roomBathroomLaundryTerrasseN
Plan · Render
Schematic plan of the main level — Left Bank, Absolute View. Move the slider to switch from the photographic render to the architectural drawing.

Handover & result

Delivered two weeks early — energy rating G → B — 81% energy saving.

  • Delivered
  • 9 months on site
  • Owner’s representation

Gallery

04 images.

Click to open the full-screen gallery — keyboard navigation with the arrow keys and Escape.

By invitation

A project of this nature begins with a conversation.

We do not send brochures. Thirty minutes with a founder is enough to scope the plot, the brief and the timetable; the costed feasibility study follows within twenty-one days, under a confidentiality agreement.

Confidential meeting

Your project deserves excellence.

Thirty minutes with a founder. A feasibility study within 21 days. A confidentiality agreement from the very first conversation.